Lead Times

 

 

 

LEAD TIMES (build to order) for July, 2026:

Batch Plants with >= 700 Bbl Silos: 18-20 Weeks
Batch Plants with <= 550 Bbl Silos: 12-14 Weeks
Deep-truss Stacking Conveyors: 16-18 Weeks
8′-6″ dia. Silos: 8-10 Weeks
Agg Bins; Low-profile Silos: 6-8 Weeks
Screw Augers: 2-3 Weeks
Rotary Vane Feeders and Blowers 3-4 Weeks
Air Compressors: 1 Week

 

IN-STOCK ITEMS ready to ship:

  • (5) – 200 LP (Gas) with Gas Air Compressor
  • (3) – 350 Portable (3Ph-480Volt)
  • (3) – 350 Portable (Gas)
  • (1) – 375 LP (Gas/Hydraulic) with Gas Air Compressor
  • (1) – 550 Portable (3Ph-480Volt)
  • (2) – 700 Portable (No Internal Positive Feed Auger System)
  • (2) – 1050 Portable (No Internal Positive Feed Auger System)

 

* All equipment FOB factory locations:
Belgrade, MN • Walnut, IL • South Bend, IN • Midvale, OH